Sonzaschool
Back

O-Level · Form 4 · Vocational · Civil Engineering

Plumbing and Pipe Fitting

Performing boring

about 4 minutes to read

Discussions
Topics in this sectionConstructing hand drilled shallow wells4 topics

Boring is the process of drilling or excavating a vertical hole into the ground to reach underground water for constructing a shallow well. In hand-drilled shallow well construction, boring creates the well shaft through which water can be extracted. This technique is commonly used in rural Tanzania where mechanical drilling equipment is not available.

Before starting any boring activity, ensure all the following tools and equipment are available:

  • Tripod – provides support and height for the drilling operation
  • Drill bits – cutting tools that penetrate different soil layers
  • Auger bit – spiral-shaped bit for removing loose soil
  • Riverside auger (conical auger) – cone-shaped auger for penetrating hard soil
  • Extension rods – extend the drilling depth as needed
  • Cross-piece handle – manual handle for rotating the drill
  • Bailers – remove water and loose material from the hole
  • Casing – pipe that prevents the well walls from collapsing
  • Filter pipe – perforated pipe that allows water to enter the well
  • Casing clamp and casing hanger – hold the casing in place
  • Steel foot plates – provide stable base support
  • Tape measure – measures depth and distances
  • Chain spanner – tightens and loosens connections

How you'll be assessedProcess assessment · Outcome assessment · Knowledge assessment

Process assessment

The student should be able to:

  • Interpret working drawings
  • Clear site
  • Lay out construction site
  • Perform boring
  • Clean tools and work area
  • Keep tools at a safety place

Outcome assessment

Boring performed conforms to given technical specifications

Knowledge assessment

Knowledge evidence:

Detailed knowledge of:

Method used: The student should explain procedures of:

  • Performing boring.

Principles: The student should explain the principle of: -

  • Performing boring.

Theories: The student should explain: -

  • Location of bore hole.
  • How to establish location of bore hole.
  • Bailing techniques.
  • Preparation for bailing.
  • Estimate the cost of labour and materials.

Circumstantial knowledge:

Detailed knowledge about:

  • Safety precautions to be observed while performing boring pump
  • Environmental requirements
  • First aid

Question

Which tool is used to remove loose soil from the borehole during drilling?

Sign in to submit your answer and have it count toward your mastery.

Sign in to practice

Tutor

Stuck? Ask me anything about this topic.

Sign in to ask the Sonza AI Tutor about this question.

Sign in to ask

Discussions

No questions yet

Sign in to ask
Loading discussions…