Topics in this sectionEstimating material and labour cost2 topics
- Maintaining records of workshop materials
- Performing job cost calculations
Maintaining Records of Workshop Materials
Maintaining records of workshop materials means systematically documenting all materials that come into, are stored in, and leave the workshop. This includes tracking tools, spare parts, refrigerants, pipes, wires, and other supplies used in refrigeration and air conditioning work. Good record-keeping helps the workshop run smoothly, prevents loss of materials, and ensures accurate costing for jobs.
- Prevents theft and loss — When every item is recorded, missing materials are quickly noticed.
- Helps with budgeting — Knowing what materials are used helps estimate costs for future jobs.
- Supports inventory control — You always know what stock is available and what needs to be reordered.
- Ensures accountability — Each worker knows what materials they have taken and for which job.
1. Material Requisition Voucher (MRV)
This form is filled out when a worker needs to take materials from the workshop store. It shows:
- Date of requisition
- Description and quantity of materials needed
- Job number or purpose
- Signature of the person requesting and the storekeeper
2. Goods Received Note (GRN)
When new materials arrive at the workshop, a GRN is completed to confirm receipt. It includes:
- Supplier name
- Date of delivery
- Items received with quantities
- Condition of items
- Signature of the receiver
3. Local Purchase Order (LPO)
This is a formal document sent to a supplier to order materials. It contains:
- Item description and quantity
- Agreed price
- Delivery date required
- Workshop or company authorization
4. Job Card
A job card tracks work on a specific refrigeration or air conditioning job. It records:
- Customer details
- Job description
- Materials used
- Labour hours
- Total cost
5. Price List
A current price list shows the cost of common materials and spare parts. It helps workers calculate job costs quickly.
6. List of Spares and Materials
An inventory list of all items held in the workshop, updated regularly to reflect current stock levels.
- Receive materials — Check delivered items against the purchase order. Complete the GRN.
- Store materials properly — Keep items in designated places. Label shelves clearly.
- Record all issues — When materials are taken, complete an MRV. Update the inventory list.
- Update inventory regularly — Count stock periodically to match records with actual items.
- File all documents — Keep GRNs, LPOs, MRVs, and job cards in a safe, organized place.
Proper handling extends the life of tools and equipment:
- Clean after use — Remove dust, oil, and refrigerant residues.
- Store in designated places — Return tools to their storage positions.
- Report damage immediately — Inform the supervisor if a tool is faulty.
- Use appropriate protective gear — Wear gloves, masks, overcoats, and safety boots when handling hazardous materials.
A refrigeration workshop received the following delivery from a supplier:
- 5 meters of copper pipe (15mm) — TZS 45,000
- 2 kg of refrigerant R-134a — TZS 120,000
- 10 metres of insulation tape — TZS 15,000
The storekeeper completes a Goods Received Note (GRN):
| Item | Quantity | Unit Price (TZS) | Total (TZS) |
|---|---|---|---|
| Copper pipe 15mm | 5 m | 9,000 | 45,000 |
| Refrigerant R-134a | 2 kg | 60,000 | 120,000 |
| Insulation tape | 10 m | 1,500 | 15,000 |
| Total | 180,000 |
The GRN is signed by the receiver and filed. The inventory list is updated to show the new stock levels.
Later, a technician takes 2 meters of copper pipe and 0.5 kg of refrigerant for a split air conditioner service. The technician fills out a Material Requisition Voucher (MRV), and the storekeeper updates the inventory accordingly.
In Tanzania, small refrigeration repair businesses in cities like Dar es Salaam, Arusha, and Mwanza use these same record-keeping practices. For example, a technician who services air conditioners in homes keeps a job card for each client, records the spare parts used, and issues a receipt. This helps the business owner know which parts sell most, plan for restocking refrigerants and filters, and quote accurate prices to customers — directly supporting better financial management of a small workshop.
How you'll be assessedProcess assessment · Outcome assessment · Knowledge assessment
Process assessment
The student should be able to: Select tools and equipment Repair material cost estimates Prepare overhead costs Prepare material requisition list Clean tools and equipment Store tools, equipment and materials
Outcome assessment
Cost estimates of materials and labour prepared as per task requirements
Knowledge assessment
Knowledge Evidence:
Detailed knowledge of:
Method used: The student should explain how to:
- Maintain records of workshop materials
Principles: The student should explain the principles related to maintaining records of workshop materials
Theories: The student should explain:
- Importance of Maintaining records of workshop materials
Circumstantial knowledge:
Detailed knowledge about:
- Safe handling of materials and documents
Question
Which of the following information is recorded on a Material Requisition Voucher (MRV)?
Sign in to submit your answer and have it count toward your mastery.
Sign in to practiceTutor
Stuck? Ask me anything about this topic.
Sign in to ask the Sonza AI Tutor about this question.
Sign in to askDiscussions
No questions yet