Formwork is a temporary construction box or mould designed to hold wet concrete in place until it hardens. It gives concrete its shape and size. Without formwork, concrete structures like walls, columns, and beams would not be able to hold their shape during construction.

How you'll be assessedProcess assessment · Outcome assessment · Knowledge assessment

Process assessment

The student should be able to:

  • Draw formworks
  • Interpret the drawings
  • Calculate materials required
  • Fix form work
  • Level and reinforce form work
  • Dismantle the form work
  • Clean tools and work place
  • Store tools to a safe place

Outcome assessment

Cast In-situ and Pre-cast formworks constructed as per the drawings and technical specifications

Knowledge assessment

Detailed knowledge of:

Method used: The student should be able to explain methods related to constructing cast In-situ and Pre-cast formworks

Principles: The student should be able to explain principles for constructing cast In-situ and Pre-cast formwork

Theories: The students should be able to explain theories related to constructing cast In-situ and Pre-cast formworks

Circumstantial knowledge: The students should explain detailed knowledge related to construct cast In-situ and Precast formwork

Question

What is the primary purpose of formwork in concrete construction?

Sign in to submit your answer and have it count toward your mastery.

Sign in to practice

Tutor

Stuck? Ask me anything about this topic.

Sign in to ask the Sonza AI Tutor about this question.

Sign in to ask

Discussions

No questions yet

Sign in to ask
Loading discussions…