Mada za sehemu hiiInstalling small central air conditionersMada 8
Installing Secondary Refrigerant Systems
A secondary refrigerant system is a cooling arrangement that uses a secondary fluid (such as brine, glycol solution, or water) to transport heat from the refrigerated space to the primary refrigeration system, rather than using the primary refrigerant directly in the cooling coils. The secondary fluid circulates through pipes between the cooling area and a heat exchanger (called a brine cooler or evaporator), where it absorbs heat and is then pumped back to be cooled again.
Secondary systems offer several advantages:
- Safety: If a leak occurs in the cooling space, only the non-toxic secondary fluid escapes, not the primary refrigerant
- Flexibility: The secondary fluid can be pumped to multiple locations from a single refrigeration unit
- Temperature control: Secondary fluids can maintain consistent temperatures across large areas
- Reduced refrigerant charge: Less primary refrigerant is needed in the system
- Primary refrigeration unit — the main compressor and condenser that removes heat from the secondary fluid
- Brine cooler (evaporator) — a heat exchanger where the secondary fluid releases its heat and becomes cooled
- Circulation pump — moves the secondary fluid through the system
- Piping network — carries the secondary fluid to the cooling coils and back
- Cooling coils or air handling units — transfer cold from the secondary fluid to the space being cooled
- Expansion tank — accommodates thermal expansion of the secondary fluid
- Controls and instrumentation — thermometers, pressure gauges, and flow switches
1. Planning and Preparation
- Read the system design drawings to understand the layout and pipe routing
- Identify all required tools and equipment from the resource list
- Check that all safety gear is available and in good condition
2. Installing the Piping Network
- Measure and cut pipes to the required lengths using appropriate cutting tools
- Join pipes using the correct method (welding for steel, soldering for copper, or solvent cementing for plastic)
- Ensure pipes are properly supported using brackets and hangers
- Maintain proper pipe slope (typically 1:100) to allow proper drainage and avoid air pockets
- Insulate all pipes carrying cold secondary fluid to prevent heat gain
3. Installing the Circulation Pump
- Mount the pump on a firm foundation, ensuring proper alignment with the motor
- Connect pump inlet and outlet pipes securely
- Install a strainer on the pump inlet to prevent debris from entering
- Check pump rotation direction before starting
4. Installing the Brine Cooler (Evaporator)
- Position the evaporator in a well-ventilated area
- Connect the refrigerant lines from the primary refrigeration system
- Ensure proper connection of secondary fluid inlet and outlet
- Check that the evaporator is level using a spirit level
5. Installing Cooling Coils and Air Handling Units
- Mount coils in positions that allow proper air circulation
- Connect secondary fluid supply and return pipes
- Seal all connections to prevent leaks
6. Installing Controls and Instrumentation
- Install thermometers at inlet and outlet points of the system
- Connect pressure gauges to monitor system pressure
- Install flow switches to protect the pump from running dry
- Connect all electrical controls according to the wiring diagram
7. Filling the System with Secondary Fluid
- Use the correct type and concentration of secondary fluid (brine or glycol solution) as specified
- Fill the system slowly through the expansion tank
- Check that all air vents are open during filling
- Close air vents once fluid begins to flow out
8. Testing and Commissioning
- Start the circulation pump and check for proper flow
- Inspect all joints for leaks using a refrigerant leak detector
- Verify that thermometers show the expected temperature drop across the system
- Check that the primary refrigeration system activates at the correct temperature setpoint
- Make necessary adjustments to flow rates and controls
A small cold room in Arusha uses a secondary refrigerant system with a 25% propylene glycol solution as the secondary fluid. The system requires a flow rate of 0.5 liters per second through cooling coils located 15 meters from the brine cooler.
Calculation: To ensure proper circulation, the pipe diameter must be sized correctly. Using the continuity equation:
Q=A×v
Where Q = flow rate (0.5 L/s = 0.0005 m³/s), A = cross-sectional area, v = flow velocity (typically 1-2 m/s for secondary systems)
For a velocity of 1.5 m/s: A=Q÷v=0.0005÷1.5=0.000333 m2
Using A=πd2÷4: d=(4×0.000333)÷π=0.0206 m≈20 mm
Therefore, use 20 mm diameter pipes for this section of the system.
- Always wear appropriate PPE including gloves, safety glasses, and safety boots
- Ensure proper ventilation when welding or using solvents
- Never over-pressurize the system during testing
- Keep fire extinguisher nearby when performing welding operations
- Follow lockout-tagout procedures when working on electrical connections
- Handle glycol solutions with care as they can cause skin irritation
| Fault | Possible cause | Remedy |
|---|---|---|
| Low flow rate | Pump malfunction or blockage | Check pump operation, clean strainer |
| Inadequate cooling | Low refrigerant in primary system or incorrect fluid concentration | Check primary system, test fluid specific gravity |
| Leaking joints | Poor joint quality or vibration | Re-weld or re-seal joints |
| Frozen pipes | Incorrect antifreeze concentration | Check and adjust glycol solution |
In Tanzania, secondary refrigerant systems are commonly used in fish processing plants in Mwanza and Dar es Salaam, where large cold rooms need to maintain temperatures between -5°C and +5°C for storing fresh fish. A local fish trader operating a small cold storage facility would use such a system to keep their produce fresh before selling it at the market. Understanding how to install and maintain these systems is valuable for technicians working with commercial refrigeration in markets, restaurants, and hotels across the country.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
The student should be able to:
- Select tools and equipment
- Read installation drawings
- Prepare machinery foundations
- Perform grouting
- Install the main components
- Perform machinery alignment
- Install ducts
- Perform modifications according to site conditions
- Perform trial run
- Take measurements of temperature and pressure quantities
- Clean tools, equipment and workplace
- Store tools and equipment
Tathmini ya matokeo
The installed central air conditioning system and documentation conform to technical specifications
Tathmini ya maarifa
Knowledge Evidence:
Detailed knowledge of:
Method used: The student should explain how to:
- Perform machinery alignment
- Measure duct pressure
- Anchor equipment
- Equipment vibration control
Principles: The student should explain fluid dynamic in pipes or ducts
Theories: The student should explain the principles of:
- Pressure volume relationship
- Manometry
- Classes of fans
- Surface heat transfer
Circumstantial knowledge:
Detailed knowledge about:
- Construction site safety management
- Environmental regulations
Swali
What is the primary function of a secondary refrigerant system?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado