Setting the Formwork
Setting the formwork is the process of constructing temporary moulds that hold concrete in place until it hardens and becomes self-supporting. Accurate formwork setting is essential for creating strong, dimensionally correct concrete foundations and structural elements. This learning activity builds on the skills of setting out and making profile boards, applying them to create precise concrete-shaping moulds.
Formwork, also known as shuttering, is a temporary structure that provides shape and support to wet concrete during casting. It must be strong enough to withstand the pressure of wet concrete, rigid enough to maintain its shape, and properly aligned to ensure the finished concrete meets design specifications.
The main purposes of formwork are:
- To shape the concrete into required dimensions
- To support the weight of wet concrete
- To create smooth or textured surface finishes
- To hold reinforcement in position (when used)
Timber Formwork
Timber formwork is commonly used in Tanzania for small-scale construction projects. It is made from planks and boards of suitable thickness (typically 25mm to 50mm for ordinary work) nailed to timber studs or bearers. Timber formwork is versatile, easy to cut and shape, and relatively inexpensive. However, it has limited reuse potential and can warp or swell if not properly treated.
Steel Formwork
Steel or metal formwork consists of prefabricated panels made from steel or aluminium. It offers greater strength, durability, and many more reuse cycles than timber formwork. Steel formwork produces smoother concrete surfaces and maintains dimensions more accurately. However, it requires higher initial investment and is less flexible for irregular shapes.
Step 1: Prepare the Excavated Trench
Before placing formwork, ensure the foundation trench is excavated to the correct depth and width according to the design. The trench bottom should be level and compacted. Remove any loose soil, stones, or debris that could affect the concrete placement.
Step 2: Set Out Formwork Lines
Using the profile boards and string lines established during the building set-out, mark the exact position of the formwork on both sides of the foundation. The formwork must be positioned so that the concrete foundation will have the correct width and alignment as specified in the construction drawings.
Step 3: Install Side Forms
Place vertical stakes or soldiers (vertical supports) at regular intervals along both sides of the trench. These stakes should be driven firmly into the ground outside the formwork area. The distance between stakes typically ranges from 600mm to 900mm, depending on the height of the formwork and the pressure of concrete.
Attach horizontal sheathing boards or formwork panels to the inner faces of these stakes. Ensure the boards are straight and properly aligned with the string lines. Use nails or clamps to secure the boards to the stakes.
Step 4: Check Alignment and Level
After installing the side forms, verify that they are:
- Aligned correctly: The forms must follow the building lines exactly, as marked by the profile boards and string lines
- Plumb (vertical): Use a spirit level to check that the formwork sides are perfectly vertical
- Level (horizontal): The top edges of opposite formwork sides should be at the same level
- Parallel: The distance between opposite formwork sides should be consistent along the entire length
Step 5: Brace and Secure the Formwork
Install bracing (horizontal ties or struts) between the two sides of the formwork to prevent them from bulging outward when concrete is poured. Cross-bracing between stakes adds stability. Ensure all joints are tight and there are no gaps where concrete could leak.
Step 6: Apply Release Agent
Before concrete placement, apply a formwork release agent (oil or mould oil) to the inner surfaces of the formwork. This prevents concrete from sticking to the formwork and makes removal easier after the concrete has cured.
A contractor needs to set timber formwork for a strip foundation that is 900mm wide and 250mm deep. The foundation extends 6 metres in length. The formwork will be constructed using 50mm thick planks.
Given:
- Foundation width = 900mm
- Foundation depth = 250mm
- Length = 6000mm
- Plank thickness = 50mm
Required: Calculate the internal dimensions of the formwork (the space where concrete will be placed).
Solution:
For the width measurement, the internal dimension equals the foundation width: 900mm.
For the depth measurement, the internal dimension equals the foundation depth: 250mm.
The internal formwork dimensions will be: 900mm (width) × 250mm (depth) × 6000mm (length).
This creates a concrete strip foundation that is 900mm wide and 250mm deep, with a total concrete volume of:
Volume=0.9m×0.25m×6m=1.35m3
Before concrete is poured, perform the following checks:
- All formwork surfaces are clean and free from debris, sawdust, or loose material
- Release agent has been applied evenly
- All nails are driven flush or slightly below the surface
- Bracing is secure and formwork cannot move
- Dimensions match the design specifications
- Formwork is properly aligned with profile board lines
When setting formwork, always wear appropriate safety gear including:
- Safety boots to protect feet from falling objects and nail punctures
- Overalls for full body protection
- Helmets when working with overhead formwork or in trenches
- Gloves when handling timber, nails, and tools
Work carefully when using hammers and saws. Ensure formwork stakes are driven firmly into the ground to prevent collapse during concrete placement.
| Problem | Cause | Solution |
|---|---|---|
| Formwork bulges outward | Insufficient bracing | Add more struts or ties |
| Concrete leakage | Gaps in joints | Seal gaps with timber strips or foam |
| Formwork not level | Incorrect setting out | Recheck with spirit level and adjust |
| Formwork misaligned | String lines moved | Reattach to profile boards and verify |
In Tanzania, setting formwork is a skill used by local fundis (craftsmen) when constructing house foundations, septic tanks, and small concrete slabs in villages and towns. For example, when building a new classroom block at a secondary school in Mwanza, the mason would need to set formwork for the strip foundations, ensuring they are properly aligned using the building lines previously established during site set-out. Accurate formwork ensures the concrete foundation is strong and correctly positioned, preventing structural problems in the walls that will be built on top of it.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
- Review technical drawings to determine formwork dimensions and layout
- Select and prepare formwork materials
- Assemble and set up formwork in the required location
- Secure formwork to prevent movement during concrete pouring
- Inspect formwork for proper alignment, level, and stability
- Clean tools and workspace after formwork setup
Tathmini ya matokeo
Formwork is set according to construction standards to shape and support the concrete during the curing process
Tathmini ya maarifa
Detailed knowledge of:
Method used: The student should be able to explain procedures for setting formwork, including material selection, assembly, and alignment techniques
Principles: The student should explain the principles involved in setting the formwork
Theories: The student should explain
- Formwork in construction
- Types of formwork materials
- Techniques for setting formwork
- Ensuring alignment and stability
- Tools and equipment used
Swali
What is the main purpose of formwork in foundation construction?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado