Mada za sehemu hiiCarrying out administrative tasks at siteMada 3
- Identifying site meetings and procedures
- Preparing performance time table and schedules
- Preparing performance reports
A performance timetable or schedule in construction is a planning tool that shows when specific tasks activities should be carried out on a building project. It helps the site supervisor know what work to do, who will do it, and when it must be completed so that the project finishes on time and within budget.
A performance timetable (also called a construction schedule) is a document that lists all construction activities in the order they must be done, together with their planned start and finish dates. It ensures that materials, workers, equipment, and money are available when needed.
Why is a Schedule Important?
- It helps the contractor plan resource allocation effectively
- It allows the client to monitor progress against planned targets
- It identifies delays early so corrective action can be taken
- It ensures smooth coordination between different trades on site
Daily Schedule
Lists tasks to be completed each working day. Used by foremen and gang leaders to assign work to workers.
Weekly Schedule
Shows work planned for each week. Used by site managers to track progress.
Monthly Schedule
Covers work planned for each month. Used for progress reporting to clients and senior management.
Master Schedule
The overall project timeline from start to completion, showing all major phases.
Before preparing a performance timetable, the site supervisor must study these documents:
- Contract documents — agreement between client and contractor
- Specifications — detailed technical requirements for materials and workmanship
- Bill of Quantities (BoQ) — list of all items of work with quantities
- Schedule of rates — unit prices for each item of work
- Detailed schedule of work — breakdown of all activities from the construction plan
Step 1: List All Activities
Identify every task that must be completed, from site clearance to finishing works. Break down the project into manageable activities.
Step 2: Determine the Duration of Each Activity
Use the BoQ quantities and the schedule of rates to calculate how long each activity will take. Consider available labor and equipment productivity rates.
Step 3: Establish the Sequence of Work
Determine which activities must finish before others can start. For example, foundations must be complete before erecting columns.
Step 4: Assign Start and Finish Dates
Working backwards from the contract deadline, or forwards from the start date, assign planned dates to each activity.
Step 5: Allocate Resources
Note which materials, equipment, and workers are needed for each activity and when they should be on site.
Step 6: Draw Up the Timetable
Present the schedule in table or chart form showing activities, durations, start dates, finish dates, and responsible persons.
A small construction company has a contract to build a single classroom at Mpanda. The contract period is 12 weeks. The work breakdown is as follows:
| Activity | Duration (weeks) | Must Start After |
|---|---|---|
| Site clearance | 1 | — |
| Foundation excavation | 1 | Site clearance |
| Foundation concrete | 1 | Excavation |
| Wall construction | 3 | Foundation concrete |
| Roofing | 2 | Wall construction |
| Finishing works | 2 | Roofing |
| External works | 2 | Finishing works |
Preparing the performance timetable:
- Week 1: Site clearance
- Week 2: Foundation excavation
- Week 3: Foundation concrete
- Weeks 4–6: Wall construction
- Weeks 7–8: Roofing
- Weeks 9–10: Finishing works
- Weeks 11–12: External works
The schedule shows that wall construction takes 3 weeks and must begin after week 3 when foundation concrete is complete. Total duration = 1+1+1+3+2+2+2 = 12 weeks, which matches the contract period.
A schedule is not static. The site supervisor must:
- Compare actual progress with the planned schedule daily or weekly
- Record any delays in the Daily Report Book
- Update the schedule when delays occur or when extra work is instructed
- Inform the client or engineer of any issues affecting the completion date
In Tanzania, a site supervisor preparing a performance timetable for a clinic construction in Mwanza would use the BoQ and specifications to estimate how many days each activity takes, then allocate workers and materials accordingly. If the schedule shows that roofing must finish by week 8 but cement delivery is delayed, the supervisor can arrange alternative supply early, preventing costly delays to the overall project.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
The student should be able to:
- Study the site organisation chart
- Study the responsibilities of each staff
- Plan the office responsibilities
- Keep a record of office documents tools and equipment
- Prepare the daily work routines
- Administer daily clerical works
- Check on all the plants and equipment
- Prepare various schedules
- Register project plants
- Register project vehicles
- Register project Materials
- Pay office bills.
- Pay office costs
- Register project Assets
Tathmini ya matokeo
The service performed according to the accepted contract specification and civil engineering work standards
Tathmini ya maarifa
Knowledge evidence:
Detailed knowledge of:
Method used: The student should explain how to participate in the supervision of site works and construction according to building regulations
Principles: The student should explain principles related to:
- Organisation of management skills
- Site Insurance approaches
- Functions of clerk of works
- Building team formation and responsibilities
- Contract formation
- Dispute settlement processes
- Modes of site operations
- Writing Certifications and commissioning
- Administering work Schedules
Theories: The student should explain:
- Functions of clerk of works
- Formation of contract
- Forms of insurances
- Schedules of conditions to contracts
- Forms of contracts
- Site inspection regulations
- Responsibility and duty outlines of building-team member
- Record keeping
- Working schedules Detailed knowledge about:
- Firefighting strategies
- Health and Safety requirements
- Project impact on Environmental
- Air and water or chemical pollution risks
Swali
What is the main purpose of a performance timetable in construction?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado