Mada za sehemu hiiSetting out a buildingMada 2
- Setting rectangular building
- Setting L shaped building
Setting Out an L-Shaped Building
Setting out an L-shaped building means locating its position on the ground at the site where more than one rectangular shape is combined. An L-shaped building is essentially two rectangular wings joined together at a right angle, forming a shape that resembles the letter "L". This type of building is common in Tanzanian homes where families need separate areas for different functions, such as a living room wing and a bedroom wing.
Before setting out any building, the ground must be cleared of vegetation, debris, and obstacles. This creates a clean working area and ensures accurate measurements.
The first step in setting out an L-shaped building is to divide the shape into two rectangles. This makes it easier to apply the same methods used for rectangular buildings.
For example, if you have an L-shaped plan like the one shown in Figure 5.18 in your textbook, you can divide it into:
- Rectangle ABCDGA (the first wing)
- Rectangle EDFG (the second wing)
By treating each wing as a separate rectangle, you can set out each section using the methods you already learned for rectangular buildings.
Step 1: Establish Building Line and Baseline
- Identify a fixed reference point such as a boundary line, road, or existing structure
- Measure an equal offset distance from the road to establish the building line
- Place pegs at these points and fix a ranging line to define the building line
- Using dimensions from the drawing, set out a reference line (baseline) along the building line
- Position peg at corner B based on specified dimensions, then locate point A using the distance of line AB
Step 2: Set Out First Right Angle at Point B
- From point B on the frontage line, use the 3:4:5 method or builder's square method to create a 90° angle
- Extend the line towards C
- Locate point C by measuring distance BC from the drawing
Step 3: Establish Second Right Angle at Point C
- At point C, establish a right angle using the 3:4:5 method towards line EDC
- Locate points E and D from C according to dimensions given in the plan
Step 4: Establish Other Square Lines
- Establish square lines from points E and F
- Locate point G according to the dimension given for FG
- Now all points A, B, C, D, E, F, and G are located
Step 5: Check Diagonals for Accuracy
- Check diagonal EG and DF — if diagonals are equal, all four corners are at right angles
- Also check diagonals AC and BD — if they are equal, all corners are correct
Step 6: Erect Setting Out Profiles
- Install profile boards at all corners to enable corner points to be easily located after excavation
- Extend ranging lines from pegs to the profiles by holding the line to pass over the peg to the profile
Step 7: Mark Foundation and Wall Thickness
- Mark out the foundation and wall thickness on the profile board
Step 8: Stretch String Lines
- Stretch string lines tight between two nails driven into tops of opposite boards
- Set boards at the same elevation so that lines are level
- String lines delineate the width of walls or foundations
- The intersection of two strings marks the position of a corner
Suppose you need to set out an L-shaped building with the following dimensions from the building plan:
- First wing (AB to BC): 8m long × 4m wide
- Second wing (CD to DE): 6m long × 3m wide
Procedure:
- Establish building line parallel to the road and set baseline AB = 8m
- At point B, use 3:4:5 method to establish right angle and measure BC = 4m to locate point C
- At point C, use 3:4:5 method to establish right angle and measure CD = 6m to locate point D, then measure CE = 3m to locate point E
- At point E, establish right angle and measure FG = 8m to locate point G
- Check diagonals:
- Diagonal AC should equal diagonal BD
- Diagonal EG should equal diagonal DF
- If all diagonals are equal, the L-shape is correctly set out
The diagonal check is the most reliable way to verify that all corners are at right angles. For each rectangular section of the L-shape:
- Measure both diagonals
- If the building is correctly set out, diagonals will be equal
- If diagonals differ, adjust the back pegs until they are equal
Remember: The frontage line should never be altered during adjustment — only adjust the back pegs.
Profile boards are timber structures erected outside the corners of the building. They serve important purposes:
- They provide reference points after trenches are excavated
- They hold string lines that guide bricklaying and foundation work
- They mark the exact position of walls and foundations
- They remain in place throughout construction for continuous reference
- An L-shaped building is divided into two rectangles for setting out
- Always establish the building line and baseline first
- Use 3:4:5 method or builder's square to create right angles
- Always check diagonals to verify accuracy
- Profile boards help locate corners after excavation
In Tanzania, a mason or site foreman setting out a new house in places like Mwanza or Arusha would apply these skills when building an L-shaped family home with a separate wing for a shop (duka) at the front. After receiving the architectural plan, they would clear the site, establish the building line from the road edge, divide the L-shape into two rectangles, and use the 3:4:5 method with locally available timber pegs and string lines to ensure the walls are perfectly square before excavating foundation trenches — saving costly corrections later.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
The student should be able to:
- Prepare drawing for a building
- Interpret drawings
- Calculate materials required
- Select tools and materials
- Identify building line
- Set 1st corner
- Set other corners
- Check squareness
- Control levels
- Erect profile board
- Mark width of foundation
- Mark width of wall
- Check accuracy
- Clean tools and work place
- Store workplace and tools at safe place
Tathmini ya matokeo
Set out building conform to drawing and technical specifications
Tathmini ya maarifa
Detailed knowledge of:
Method used: The student should describe how to set L shaped building
Principles: The student should explain principles related to setting out L shaped buildings
Theories: The students should explain importance of identifying building lines when setting out L shaped building
Circumstantial knowledge: Workshop safety rules and regulations
Swali
What is the first step in setting out an L-shaped building?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado