Mada za sehemu hiiEstimating material and labour costMada 3
- Maintaining records of workshop materials
- Maintaining man hours and day of workshop staff
- Performing job cost calculations
Maintaining Records of Workshop Materials
Maintaining records of workshop materials means systematically documenting all materials that enter, leave, and remain in the agro-mechanics workshop. This process ensures that the workshop manager knows exactly what materials are available, what has been used, and what needs to be reordered.
- Prevents theft and loss – Clear records show if materials are missing
- Helps with budgeting – Knowing material usage helps plan future purchases
- Ensures availability – Prevents work stoppages due to unavailable materials
- Aids in cost calculation – Accurate records are needed to calculate job costs
- Supports accountability – Each material can be traced to a specific job or worker
1. Material Requisition Voucher (MRV)
This form is used when a worker or student needs to take materials from the workshop store. It records:
- Date of requisition
- Items requested and quantities
- Purpose (job card number)
- Signature of the person requesting
- Signature of the storekeeper approving the release
2. Good Received Note (GRN)
When new materials arrive at the workshop, the GRN records:
- Date of delivery
- Supplier name
- Items received with quantities
- Condition of items
- Signature of person receiving goods
3. Local Purchase Order (LPO)
This document is used to order materials from external suppliers:
- Order number and date
- Items required with quantities
- Expected delivery date
- Authorized signature
4. Job Card
This records work assigned to each student or worker:
- Job description
- Materials used
- Time spent
- Labor cost
- Total job cost
5. Price List
A current list of material costs used for estimating and billing:
- Item description
- Unit price (TZS)
- Supplier source
- Receive new materials – Check delivered items against the LPO, complete the GRN, and update the inventory register
- Store materials properly – Organize items by category and keep the storage area clean and secure
- Issue materials using MRV – Only release materials with a properly completed requisition form
- Record all usage – Update the inventory each time materials are taken or used
- Reconcile regularly – Compare physical stock with written records weekly or monthly
- Report discrepancies – Investigate any differences between actual stock and recorded amounts
A workshop received the following materials from Mbeya Hardware:
- 5 liters of engine oil at TZS 15,000 per liter
- 10 kg of welding rods at TZS 8,000 per kg
- 2 spark plugs at TZS 5,000 each
Step 1: Complete the Good Received Note (GRN)
| Item | Quantity | Unit Price (TZS) | Total (TZS) |
|---|---|---|---|
| Engine oil | 5 L | 15,000 | 75,000 |
| Welding rods | 10 kg | 8,000 | 80,000 |
| Spark plugs | 2 | 5,000 | 10,000 |
| GRAND TOTAL | 165,000 |
Step 2: Update inventory register
After recording the GRN, the storekeeper adds these items to the inventory, increasing the workshop's stock records.
Step 3: When materials are issued
A student takes 2 liters of engine oil for a repair job. The storekeeper fills out a Material Requisition Voucher (MRV), records the issue in the inventory, and notes the job card number for cost calculation.
A small agro-mechanics workshop in Mwanza that services farm equipment can use these same record-keeping methods. By maintaining proper material records, the owner knows when to reorder spare parts, can accurately charge customers for parts used, and can identify if tools or materials are being misused — directly improving the business profitability and professionalism.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
Students should be able to:
- Maintain records of workshop materials
- Prepare material request.
- Clean the tools and equipment.
- Store tools, equipment and other materials.
Tathmini ya matokeo
Maintained records of workshop materials as per task to be Performed.
Tathmini ya maarifa
Knowledge evidence:
Detailed knowledge of:
Method used: Students should explain how to:
- Maintain records of workshop materials
Principles: Students should explain the principles of Maintain records of workshop materials.
Theories: Students should explain:
- Maintaining records of workshop materials
Circumstantial knowledge:
Detailed knowledge about:
- Safety precautions involved in performing the task.
- Safe handling of materials and documents.
Swali
Which of the following is recorded on a Material Requisition Voucher (MRV)?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado