Mada za sehemu hiiEstimating material and labour costMada 3
- Maintaining records of workshop materials
- Maintaining man hours and day of workshop staff
- Performing job cost calculations
Effective time management of workshop staff ensures that repair and maintenance jobs are completed efficiently, costs are accurately estimated, and the workshop operates profitably.
Man hour is the amount of work one person completes in one hour. If two workers each work for three hours on a tractor repair, that equals 2×3=6 man hours of labour.
Day of workshop staff (or person-day) is the amount of work one person completes in one full working day, usually counted as 8 working hours.
Job card is a document that records the job assigned to a technician, the time it started, the time it finished, materials used, and the total labour hours charged to the customer.
- Helps the workshop owner charge customers the correct labour cost
- Shows which jobs take too long and need improvement
- Ensures fair payment of wages to staff
- Allows proper planning of daily tasks and schedules
- Tracks staff attendance and productivity
- Job card – opened for each job; records start time, finish time, and task details
- Daily time sheet – lists all staff, their clock-in and clock-out times
- Material requisition voucher (MRV) – records materials drawn from the store for each job
- Goods received note (GRN) – confirms new materials purchased for the workshop
Step 1: Open a Job Card
When a customer brings a machine for repair, the supervisor opens a job card and assigns it to a technician.
Step 2: Record Start and Finish Times
The technician writes the time work begins and the time work ends on the job card.
Step 3: Calculate Total Man Hours
Subtract the start time from the finish time, and take away any breaks. If more than one person worked on the job, multiply the hours by the number of workers. For example, if a technician starts at 08:00 and finishes at 14:00, the job took 14−8=6 man hours.
Step 4: Record on the Daily Time Sheet
Add the technician's total hours worked for the day on the daily time sheet. This shows attendance and total output per person.
Step 5: Summarise for Payment
At the end of the week or month, total the man hours for each technician and multiply by the agreed hourly rate to calculate labour costs.
A small agro-mechanics workshop employs three technicians. On Monday, each technician worked on different jobs.
| Technician | Job start | Job finish | Man hours worked |
|---|---|---|---|
| Juma | 08:00 | 16:00 | 16−8=8 |
| Amina | 08:30 | 14:30 | 14.5−8.5=6 |
| Rajabu | 09:00 | 13:00 | 13−9=4 |
The workshop charges TZS 5,000 per man hour to the customer.
Total labour charges for the day: Total man hours =8+6+4=18 man hours
In man days (8 hours each): 18 ÷ 8 = 2.25 man days
Labour charges =18×5,000= TZS 90,000
Wages the owner pays each technician (at TZS 3,000 per hour):
- Juma: 8×3,000= TZS 24,000
- Amina: 6×3,000= TZS 18,000
- Rajabu: 4×3,000= TZS 12,000
By keeping accurate job cards and time sheets, the owner knows exactly what to charge the customer and what to pay each worker.
- Always use a job card for every job, no matter how small
- Keep the daily time sheet posted where all staff can see it
- Review man hour records weekly to spot problems early
- Ensure staff wear safety gear (overcoat, boots, gloves, mask) while working, as this affects their efficiency and safety
A small agro-mechanics workshop in Morogoro uses job cards and time sheets to track how long each mechanic spends on repairs. By knowing the exact man hours spent on servicing a water pump for a farmer, the owner can charge a fair price for labour, pay the mechanic correctly, and still make a profit — ensuring both the farmer and the workshop benefit.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
Students should be able to:
- Maintain man hours and day of workshop staff.
- Clean the tools and equipment.
- Store tools, equipment and other materials.
Tathmini ya matokeo
Maintained man hours and day of workshop labour. Cost estimates of materials and labour prepared.
Tathmini ya maarifa
Knowledge evidence:
Detailed knowledge of:
Method used: Students should explain how to:
- Interpret inspection report.
- Calculate the costs of identified materials and labour.
Principles: Students should explain the principles of determine man-hour rate to make labour cost estimates.
Theories: Students should explain:
- Importance of estimating materials and labour cost.
- Importance of using genuine materials.
- Use of parts catalogue.
Circumstantial knowledge:
Detailed knowledge about:
- Safety precautions involved in performing the task.
- Safe handling of materials and documents.
Swali
What is a man hour?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado