Mada za sehemu hiiConstructing archesMada 3
- Setting arches
- Making centering for arches
- Constructing different types of arches
Making Centring for Arches
Centring is a temporary wooden framework that supports an arch during construction. It holds all the wedge-shaped bricks or stones (called voussoirs) in the correct position until the keystone is placed and the mortar has fully cured. Without proper centring, the arch would collapse before the mortar hardens.
The centring must be precisely shaped to match the arch's intended curve and be strong enough to bear the weight of all the masonry materials placed on top of it.
- Supports the arch during construction – keeps voussoirs in place until the keystone is set
- Ensures accuracy – the curve of the centring determines the final shape of the arch
- Allows proper load distribution – the arch becomes self-supporting only after the mortar cures
- Can be reused – well-built timber centring can be used for multiple arches
Timber (wood) is the most common material for centring because it is:
- Easy to work with – can be cut and shaped on site
- Cost-effective – readily available and inexpensive
- Simple to erect and dismantle
- Reusable for multiple projects
Different arch shapes require different centring templates:
- Semi-circular arch – curve is a perfect half-circle; centre lies on the springing line
- Segmental arch – curve is less than a semicircle (a shallow curve)
- Pointed (Gothic) arch – formed by two intersecting curves meeting at a point
Step 1: Determine the Arch Shape and Size
Identify whether the arch is semi-circular, segmental, or pointed. Measure the span (horizontal distance between supports) and rise (vertical height from springing line to crown).
Step 2: Create a Template
Use a compass or a flexible strip of wood (battens) to draw the arch curve on paper or cardboard. This template will guide the cutting of the actual centring pieces.
For a segmental arch, calculate the radius using the formula:
R=8HS2+2H
Where:
- S = span
- H = rise
- R = radius of the arch curve
Example: For a segmental arch with span S = 4 metres and rise H = 1 metre:
R=8×142+21=816+0.5=2+0.5=2.5 metres
The radius is 2.5 metres.
Step 3: Build the Support Frame
Construct a sturdy base frame using timber or metal supports. The frame must be:
- Wide enough to support the entire span of the arch
- Level and securely anchored to the ground or wall
- Strong enough to carry the weight of wet masonry
Step 4: Cut the Curved Formwork
Cut wooden planks or plywood to match the arch curve using the template. The curved pieces should be smooth and evenly spaced.
Step 5: Assemble the Centring
Fix the curved pieces onto the frame using nails or screws. Ensure they are properly aligned and form a smooth curve.
Step 6: Add Bracing and Supports
Add vertical supports (posts) and diagonal bracing beneath the formwork to prevent sagging or shifting during construction. Proper bracing is essential for stability.
Step 7: Fine-tune Alignment
Use adjustable props or shims to fine-tune the height and alignment. Check with a spirit level to ensure:
- The centring is perfectly level
- The curve matches the design
- Both sides are symmetrical
Step 8: Begin Laying Voussoirs
Once the centring is secure, begin laying the voussoirs on the centring, starting from the springing points on both sides and working toward the centre.
Step 9: Remove Centring After Curing
After the mortar has fully cured (typically 24–48 hours or as instructed), carefully dismantle the centring:
- Remove the vertical supports first
- Then remove the curved formwork
- Ensure the arch is stable before fully removing all supports
| Term | Definition |
|---|---|
| Voussoirs | Wedge-shaped stones or bricks that form the arch |
| Keystone | The central wedge-shaped block at the crown of the arch |
| Springing line | The imaginary line joining the two springing points where the arch begins |
| Springing point | The point where the arch curve starts on each side |
| Abutment | The end support of an arch |
| Span | Clear horizontal distance between the two supports |
| Rise | Vertical distance from springing line to the crown |
Problem: Centring begins to sag during construction
Possible causes:
- Insufficient bracing
- Weak timber members
- Overloading the centring
Solution: Add more vertical and diagonal supports. Ensure all members are properly sized for the load.
Problem: Centring collapses during construction
Possible causes:
- Inadequate fixing to supports
- Weak joints
- Accidental impact
Solution: Ensure all joints are properly secured. Check the centring regularly during construction.
Problem: Formwork removed too early
Consequence: The arch may collapse or crack because the mortar has not gained sufficient strength.
Solution: Allow adequate curing time (at least 24–48 hours) before removing centring.
When constructing centring:
- Wear gloves and safety boots
- Ensure ladders or working platforms are stable
- Check all joints are secure before placing weight on the centring
- Use a helmet when working at height
In Tanzania, masons use centring when constructing arch-shaped doorways and windows in traditional buildings, especially in historical sites like Bagamoyo or in modern homes featuring decorative arches. For example, a mason in Dar es Salaam building a semi-circular arch above a restaurant entrance would first construct timber centring to support the brick voussoirs until the mortar cures, ensuring the arch remains stable and does not collapse during construction.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
The student should be able to:
- Interpret drawings
- Prepare tools and equipment
- Draw the Arc
- Cut the Template
- Build the Frame
- Attach the Arc
- Install Diagonal Bracing
- Position the Centering
- Check Level
- Clean the work area and store tools
Tathmini ya matokeo
Centering for arches is made as per technical standards to support the arch during construction
Tathmini ya maarifa
Detailed knowledge of:
Method used: The student should explain different procedures of constructing the centering frame
Principles: The student should explain the principles involved making centering for arches
Theories: The student should explain:
- Types of arches
- Materials and their properties
- Tools and specific functions
- Different types of formwork
- Arches behaviour under the load Circumstantial knowledge:
Detailed knowledge about:
- Safety procedures to be observed when setting arches
- First aid
- Environmental issues
Swali
What is the primary purpose of centring in arch construction?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado