Mada za sehemu hiiPerforming site surveyMada 5
- Determining boundaries
- Determining benchmark and beacon
- Taking readings and booking
- Booking levelling readings
- Analysing data by HI and RF
Analysing Levelling Data by HI and RF Methods
In surveying, after taking staff readings at different points, we must reduce the data to find the Reduced Level (RL) of each point. This is done using either the Height of Instrument (HI) method or the Rise and Fall (RF) method. Both methods give the same results if done correctly.
- Back Sight (BS): The first staff reading taken after setting up the instrument, always on a point of known RL (usually a Benchmark).
- Intermediate Sight (IS): Any staff reading taken on points whose RL we want to determine (not BS or FS).
- Fore Sight (FS): The last staff reading taken before moving the instrument to a new station.
- Reduced Level (RL): The elevation of a point above or below the datum (sea level).
- Benchmark (BM): A point of known RL used as a reference.
- Height of Instrument (HI): The RL of the instrument axis after the level is set up.
The HI method calculates the RL of each point using the instrument height.
Formula
HI=RLknown+BS
RLpoint=HI−IS (or FS)
Steps
- Set up the level at a convenient point.
- Take a BS reading on the Benchmark (BM). Add this to the BM's RL to get the HI.
- Take IS readings on points whose RL you want to find. Subtract each from the HI.
- Take an FS reading to close the setup or before moving the instrument.
- Sum of BS − Sum of FS should equal last RL − first RL (arithmetic check).
The RF method finds the difference in elevation between consecutive points.
Formula
If the staff reading decreases: Rise = Previous reading − Current reading
If the staff reading increases: Fall = Current reading − Previous reading
RLpoint=RLprevious+Rise (or −Fall)
Steps
- Record the first reading (BS) on the BM.
- Compare each subsequent reading with the previous one to find Rise or Fall.
- Add Rise to or subtract Fall from the previous RL to get the new RL.
- Perform arithmetic checks:
- Sum of BS − Sum of FS = Sum of Rises − Sum of Falls = Last RL − First RL
A level was set up at Station 1. The following staff readings were taken:
| Point | Staff Reading (m) |
|---|---|
| BM | 1.685 |
| A | 2.350 |
| B | 1.280 |
| C | 2.900 |
The RL of BM is 100.000 m. Calculate the RL of points A, B, and C using both methods.
Solution by HI Method
| Point | BS | IS | FS | HI | RL |
|---|---|---|---|---|---|
| BM | 1.685 | — | — | 101.685 | 100.000 |
| A | — | 2.350 | — | — | 99.335 |
| B | — | 1.280 | — | — | 100.405 |
| C | — | — | 2.900 | — | 98.785 |
Calculations:
- HI = 100.000 + 1.685 = 101.685 m
- RL of A = 101.685 − 2.350 = 99.335 m
- RL of B = 101.685 − 1.280 = 100.405 m
- RL of C = 101.685 − 2.900 = 98.785 m
Check: Sum of BS − Sum of FS = 1.685 − 2.900 = −1.215 m
Last RL − First RL = 98.785 − 100.000 = −1.215 m ✓
Solution by RF Method
| Point | Staff Reading | Rise (m) | Fall (m) | RL |
|---|---|---|---|---|
| BM | 1.685 | — | — | 100.000 |
| A | 2.350 | 0.000 | 0.665 | 99.335 |
| B | 1.280 | 1.070 | 0.000 | 100.405 |
| C | 2.900 | 0.000 | 1.620 | 98.785 |
Calculations:
- BM to A: 1.685 − 2.350 = −0.665 (Fall), RL = 100.000 − 0.665 = 99.335 m
- A to B: 2.350 − 1.280 = 1.070 (Rise), RL = 99.335 + 1.070 = 100.405 m
- B to C: 1.280 − 2.900 = −1.620 (Fall), RL = 100.405 − 1.620 = 98.785 m
Check: Sum of Rises − Sum of Falls = 1.070 − 2.690 = −1.620 m
Last RL − First RL = 98.785 − 100.000 = −1.620 m ✓
- HI Method: Preferred when there are many intermediate sights, as it is faster and requires fewer calculations.
- RF Method: Preferred when there are few intermediate sights and accuracy is important, as errors are more easily detected at each step.
Both methods are acceptable and will give the same results when correctly applied.
In Tanzania, HI and RF methods are used when constructing buildings, roads, or drainage systems. For example, a civil engineer at a construction site in Mwanza may use these methods to determine the correct ground levels before laying foundations, ensuring that water flows away from buildings and that floors are level.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
The student should be able to:
- Set the Benchmark (BM)
- Determine the Height of Instrument (HI)
- Calculate Reduced Levels (RL)
- Repeat for Intermediate Points
- Document in a Levelling Table
- Calculate the Rise or Fall
- Clean tools and store them
Tathmini ya matokeo
Surveyed site conforms to technical specifications
Tathmini ya maarifa
Knowledge evidence:
Detailed knowledge of:
Method used: The student should explain different ways of:
- Taking readings
- Booking readings
- Set out angles
- Computing methods
Principles: The student should explain the different principles of:
- Setting levelling instruments
- Taking and booking reading
- Surveying terminologies
Theories: The student should explain:
- Set and reading
- Instruments
- Booking and calculating
- Reduced levels
- Set angles
- Set straight lines
- Transferring
- Care of Detailed knowledge about:
- Safety precautions related to surveying instruments
- Environmental issues
- First aid
Swali
In levelling surveys, what does the abbreviation BS stand for?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado