Mada za sehemu hiiPreparing measured drawings and documentationMada 3
- Preparing documentation of measured work
- Preparing as-built drawings
- Archiving as-built drawings
Preparing Documentation of Measured Work
Documentation of measured work is the process of organizing, recording, and presenting all the physical measurements taken from an existing building so that they can be understood and used for future purposes such as maintenance, renovation, or alterations. After taking measurements on-site, you must organise them properly to create useful records.
When you measure a building, you collect many numbers, sketches, and notes. If you leave this information unorganised, it becomes difficult to understand or use later. Good documentation ensures that:
- The measurements are accurate and easy to read
- Anyone can understand the building's features
- The information is available for building maintenance or renovations
- The records can be stored and retrieved when needed
The textbook outlines four main steps to follow when preparing documentation of measured work.
Step 1: Review and Organize Information from the Site
Before you start writing your documentation, review all the sketches and notes you collected during the site measurement. Check for accuracy and correctness. Then, organize the information systematically by grouping similar items together. For example:
- Floor plans or layout sketches in one group
- Elevation sketches in another group
- Section sketches in another group
This organization helps you find information quickly when you need it.
Step 2: Write General Building Information
Include information that identifies the building. This includes:
- Location: Where the building is situated (for example, the school compound near the administration block)
- Name or purpose: What the building is used for (for example, a toilet block, store room, or classroom)
- Date of measurement: When the measurements were taken
- Purpose of measurement: Why you are documenting the building (for example, to prepare as-built drawings for maintenance)
- Client or occupant: If relevant, the name of the person using the building
Step 3: Describe the Methods Used in Measurement
Record how you took the measurements. This helps others understand the accuracy of your work and allows the same method to be used in future measurements. Include:
- Tools used: List all measuring tools such as tape measure, laser distance meter, hose level, clipboard, and pencil
- Methods used: Explain your measurement procedures (for example, measuring from corner to corner, taking diagonal measurements for verification)
- Challenges faced: Note any difficulties encountered during measurement
- Steps taken to ensure accuracy: Describe how you checked your measurements
Step 4: Verify or Add Annotations and Notes
Add detailed information that helps someone understand the building better. This includes:
- Condition of building components: Note whether walls, doors, windows, or fixtures are in good condition or need repair
- Names of spaces: Label each room or area (for example, "Store Room," "Girls' Toilet," "Veranda")
- Dimensions: Ensure all measurements are clearly written next to the relevant sketches
- Materials used: Note the materials for walls, floors, and roofs (for example, "sand-cement block wall," "corrugated iron roof")
- Additional observations: Record anything else relevant, such as damage, modifications, or special features
Suppose you measured a small school store room with the following findings:
Step 1 - Organize Information: You have sketches of the floor plan, front elevation, and one section. Group them separately in your folder.
Step 2 - General Building Information:
- Location: School compound, behind the science laboratory
- Building use: General store for school materials
- Date: 15 March 2024
- Purpose: To prepare as-built drawings for building maintenance
Step 3 - Methods:
- Tools used: 30 m measuring tape, 5 m tape, clipboard, pencil
- Method: Measured all exterior walls from corner to corner, measured door and window widths, measured wall heights using a measuring tape
- Accuracy check: Took diagonal measurements to verify rectangular shape
Step 4 - Annotations:
- Wall thickness: 150 mm (sand-cement blocks)
- Door: Single leaf, 900 mm wide, 2100 mm high
- Window: 1200 mm wide, 1200 mm high, with metal bars
- Roof: Corrugated iron sheets on timber rafters
- Condition: Good, but window frame shows signs of rust
In groups, take the sketches and information you obtained from measuring a simple building in your school compound (such as a toilet or store) and:
- Review all your site information for accuracy
- Organise sketches by type (plans, elevations, sections)
- Write the general building information
- Add annotations and notes for clarity
Use a clipboard, pencil, and paper to present your documented work neatly.
In Tanzania, building documentation is essential for property management and maintenance. For example, a school caretaker who has documented measurements of a classroom block can accurately order materials for repairs—such as calculating how many corrugated iron sheets are needed for a new roof (e.g., 12 sheets at TSh 45,000 each = TSh 540,000) or how many window panes to replace—without guessing, saving both time and money.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
The student should be able to:
- Review information obtained from site
- Organise information obtained from site
- Write general information of the measured building
- Verify and add annotations on the drawings where necessary
Tathmini ya matokeo
Well organised and documented set of measured drawings from site conforming to required standards
Tathmini ya maarifa
Knowledge evidence:
Detailed knowledge of:
Method used: The student should explain methods involved in the:
- Taking measurements of buildings on site
- Preparation of measured drawings documentation
Principles: The student should explain the principles involved in:
- Taking measurements
- Documentation writing
Theories: The student should explain:
- Types of measured drawings
- Dimensioning techniques
- Interpretation of drawings Detailed knowledge about:
- Safety requirements
- Accuracy
- Site and environmental issues
Swali
What is the primary purpose of documenting measured work from a building?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado