Mada za sehemu hiiDesigning and making domestic refrigeratorMada 6
Constructing Refrigerant Pipe Circuit
A refrigerant pipe circuit is the closed network of copper tubes that connects the compressor, condenser, evaporator, and other components in a refrigeration system. The circuit carries the refrigerant (gas or liquid) through all the cooling components, allowing heat transfer to occur and produce the cooling effect in a refrigerator. Constructing this circuit correctly is essential for the refrigerator to work efficiently and safely.
The pipe circuit forms the circulatory system of a refrigerator. It allows the refrigerant to:
- Carry heat from the inside of the refrigerator (evaporator) to the outside (condenser)
- Change state from liquid to gas and back to liquid during the cooling cycle
- Maintain the correct pressure throughout the system
Without a properly constructed pipe circuit, the refrigerant cannot circulate and the cooling process fails.
When constructing a domestic refrigerator pipe circuit, you will connect these main components:
| Component | Function in the Circuit |
|---|---|
| Compressor | Pumps refrigerant through the entire circuit |
| Condenser | Releases heat from the refrigerant |
| Evaporator | Absorbs heat from the refrigerator cabinet |
| Capillary tube | Reduces pressure and controls refrigerant flow |
| Filter dryer | Removes moisture and contaminants from refrigerant |
The pipe circuit also includes connecting lines: the suction line (from evaporator to compressor), liquid line (from condenser to capillary), and discharge line (from compressor to condenser).
Before constructing the circuit, gather these tools:
Cutting and Preparation Tools:
- Pipe cutter or hacksaw
- Reamer or deburring tool
- Measuring tape
Bending Tools:
- Spring bender or pipe bending machine
- Bending springs (internal and external)
Joining Tools:
- Oxy-acetylene welding plant or propane torch
- Silver alloy or phosphorous-copper brazing rods
- Flux and cleaning brushes
Testing and Measuring Tools:
- Manifold gauge set
- Vacuum pump
- Electronic leak detector or bubble solution
- Multimeter (for electrical checks)
Safety Gear:
- Heat-resistant gloves
- Safety goggles or face shield
- Fire-resistant blanket
- First aid kit
Step 1: Planning and Measuring
- Study the refrigerator design diagram to understand the layout of components
- Measure the distances between each component accurately
- Add allowance for pipe bending — the straight length will be longer than the measured distance
- Mark all cutting and bending points clearly on the copper tubing using a marker
Example Calculation: If the distance from the evaporator outlet to the compressor inlet is 80 cm, and you need to make two 90° bends, you will need approximately 90 cm of tubing (each bend adds about 5 cm to the straight length). Always cut longer and trim during fitting rather than cutting too short.
Step 2: Cutting the Tubing
- Select the correct diameter of copper tubing for the system (usually 6 mm or 8 mm for domestic refrigerators)
- Use a pipe cutter to make a clean, square cut — this ensures proper sealing when joining
- Hold the tubing firmly in a heavy-duty clamp
- Rotate the cutter evenly around the tube, tightening slightly after each full rotation
- Remove burrs and sharp edges using a reamer or deburring tool
Important: Always cut outside the refrigerator cabinet to avoid spreading metal filings inside the system.
Step 3: Bending the Tubing
- Select the appropriate bending method — spring bender for small diameters or machine bender for larger pipes
- Calculate the bend radius required (minimum radius should be 3 times the tube diameter)
- For manual bending:
- Insert the appropriate spring inside the tubing to prevent kinking
- Bend gradually at the marked point — avoid sudden or over-bending
- Check the bend angle using a protractor or angle gauge
- For machine bending:
- Set the desired angle on the bending machine
- Position the tubing in the bending die
- Operate the machine smoothly
Key Point: A kink or wrinkle in the pipe restricts refrigerant flow and reduces cooling efficiency. The bend must be smooth and uniform.
Step 4: Joining and Connecting
- Clean all joint surfaces thoroughly using sandpaper or a wire brush
- Apply flux to the cleaned surfaces (for brazing)
- Fit the components together, ensuring proper alignment
- Heat the joint evenly using an oxy-acetylene torch or propane torch
- Feed the brazing rod into the joint as the metal reaches brazing temperature (about 650°C for copper)
- Allow the joint to cool naturally — do not quench with water
- Inspect the joint for proper fillet formation and smoothness
Types of Joints:
- Socket joints — tubing fits into a socket fitting
- Flare joints — tubing end is flared and tightened with a nut
- Braze joints — permanently joined using brazing alloy
Step 5: Installing Additional Components
- Install the filter dryer in the liquid line (between condenser and capillary tube)
- Position the capillary tube inside the suction line for heat exchange (in many designs)
- Secure all components using brackets and clamps
- Ensure adequate clearance around the compressor for vibration and maintenance
Step 6: Testing the Circuit
- Perform a leak test:
- Connect the manifold gauge and nitrogen tank or refrigerant cylinder
- Pressurize the system to the recommended test pressure (typically 10-15 bar for R134a)
- Apply bubble solution or use an electronic leak detector at all joints
- No bubbles should form; no alarm should sound
- If a leak is found, mark the location, release pressure, repair the joint, and retest
- Use a vacuum pump to remove air and moisture:
- Connect vacuum pump to the system
- Evacuate for at least 30 minutes
- Achieve a vacuum of 500 microns or lower
- Always wear safety goggles and heat-resistant gloves when brazing
- Keep a fire extinguisher and fire-resistant blanket nearby
- Work in a well-ventilated area to avoid inhaling fumes
- Secure cylinders of gas or nitrogen properly — never lay them on their side
- Check all connections are tight before pressurizing
- Never over-pressurize the system beyond manufacturer specifications
A properly constructed refrigerant pipe circuit should meet these criteria:
- All joints are smooth, properly filled, and leak-free
- No kinks, dents, or wrinkles in any section of tubing
- Correct pipe diameters used throughout
- Proper support and clamping to prevent vibration
- Sufficient clearance for maintenance and airflow
- All connections are tight and secure
| Fault | Cause | Prevention |
|---|---|---|
| Leaky joints | Poor cleaning, insufficient heat, weak brazing | Clean thoroughly, heat evenly, use correct filler |
| Restricted flow | Kinks, dents, improper bends | Use bending springs, bend gradually |
| Blockage | Foreign material, flux residue | Clean thoroughly, use appropriate flux |
| Corrosion | Moisture in system | Evacuate properly, use filter dryer |
Constructing a refrigerant pipe circuit involves careful planning, accurate measuring, proper cutting and bending, secure joining through brazing, and thorough testing for leaks. Using the correct tools and following safety procedures ensures the circuit will function efficiently and reliably throughout the refrigerator's service life.
In Tanzania, a refrigerator is essential for preserving food and medicine in homes, shops, and health facilities. If you work as a refrigeration technician in Dar es Salaam or any other town, constructing a proper refrigerant pipe circuit is a core skill you need to service or repair refrigerators. For example, when a customer's refrigerator stops cooling, you may need to replace the copper tubing connecting the evaporator and compressor — using proper bending and brazing techniques ensures the repaired refrigerator runs efficiently and saves the customer the cost of buying a new one. This skill also enables small business owners to start their own refrigeration repair services, earning income while serving their community.
Jinsi utakavyotathminiwaTathmini ya mchakato · Tathmini ya matokeo · Tathmini ya maarifa
Tathmini ya mchakato
- Select materials, tools and equipment
- Make panels to required specifications
- Assemble panels to form refrigerator walls
- Make refrigerator door with gasket
- Mount main components of the refrigeration piping circuit
- Pipe the refrigeration circuit
- Install wiring circuit
- Perform spray painting
- Evaluate and charge with refrigerant
- Apply safety measures
- Clean workplace tools and equipment
- Store tools and equipment
- Commission the system performance
Tathmini ya matokeo
Designed refrigerator as per technical Specifications and aesthetic appearance
Tathmini ya maarifa
Knowledge Evidence:
Detailed knowledge of:
Method used: The student should explain how to:
- Pipe the different types refrigeration circuits
- Determine charge
- Apply safety precautions
Principles: The student should explain the principles of:
- Refrigeration cycle
- Designing a refrigerator
Theories: The student should explain:
- calculations
- System components capacity
- P-h chart/diagrams
- Material science
- Refrigeration cycles
Circumstantial knowledge:
Detailed knowledge about:
- Safe handling of working tools and equipment
- Aesthetical appearance
- Environmental impacts
Swali
What is the main function of the refrigerant pipe circuit in a domestic refrigerator?
Ingia ili kuwasilisha jibu lako na lihesabiwe katika umahiri wako.
Ingia ili kufanya mazoeziMwalimu
Umekwama? Niulize chochote kuhusu mada hii.
Ingia ili kumuuliza Mwalimu wa AI wa Sonza kuhusu swali hili.
Ingia ili kuulizaMajadiliano
Hakuna maswali bado